Saturday, February 1, 2014

From December 7, 2013.



December 7, 2013.  


There was a wild Northern wind blowing as the Selvik Tugs Susan, L., Jimmy L.  and the Cameron helped guide  the CSL Niagara down the bay, past Pottawatomie State Park.

Her bow covered with a beard of ice from breaking her way down Green Bay, the Canadian ship CSL Niagara, worked her way into Sturgeon Bay for some repair work in the Graving Dock at Bay Ship Building.

CSL Niagara is lined up for the graving Dock at Bay Ship.
Sandwiched between tugs Susan L (left) and Jimmy L (rt)
As time progressed the weather deteriorated into a snowy fog while the tugs split ice to move the 700+’ ship to it's position in the graving dock.
The Susan L Selvik keeping the Niagara's bow positioned

The Tug Jimmy L pulling her in.  Notice the KORT Nozzle around Niagara's prop?



The Jimmy L. up close


No comments:

Post a Comment