December 7, 2013.
There was a wild Northern
wind blowing as the Selvik Tugs Susan, L., Jimmy L. and the Cameron helped guide the CSL Niagara down the bay,
past Pottawatomie State Park.
Her bow covered
with a beard of ice from breaking her way down Green Bay,
the Canadian ship CSL Niagara, worked
her way into Sturgeon Bay for some repair work in the Graving Dock at Bay Ship
Building.
CSL Niagara is lined up
for the graving Dock at Bay Ship.
Sandwiched between tugs Susan L (left) and Jimmy L (rt)
As time
progressed the weather deteriorated into a snowy fog while the tugs split ice
to move the 700+’ ship to it's position in the graving dock.
The Susan L Selvik keeping the Niagara's bow positioned
The Tug Jimmy L pulling her in. Notice the KORT Nozzle around Niagara's prop?
The Jimmy L. up close
No comments:
Post a Comment